Question
A person agreed with a contractor that he would build him an apartment for (40,000 pounds) without finishing. He gave him two-thirds of the amount at the start of the agreement and then paid the rest upon completion of the construction. This contractor delayed the construction by four years. Recently, building prices have increased, and the contractor is demanding more than what was agreed. Does he have the right to demand it on the grounds that he is harmed, knowing that the money owner is also harmed because the prices of finishing materials have increased too, and knowing that the money owner did not contribute to the delay in construction, which is due to the contractor and his partners? Does the contractor have the right to withdraw from the agreement and return the money to its owner?
Answer
All praise is due to Allah, and peace and blessings be upon the Messenger of Allah, and upon his family and companions. To proceed:
He does not have the right to withdraw from this agreement, and he must carry it out. He has no right to demand an amount exceeding the agreed sum, as long as the delay in construction was caused by him. The basis for this is the saying of Allah, the Most High:يَا أَيُّهَا الَّذِينَ آمَنُواْ أَوْفُواْ بِالْعُقُودِ{المائدة:1}. However, suppose the delay was not caused by him but by compelling circumstances that prevented the construction. For example: if a contract to build a large building, whose construction requires a long period, was concluded between two parties, and the price of a cubic metre of construction was set at one hundred riyals, while the cost of one cubic metre of iron, cement, timber and the like was eighty riyals, and then an unexpected war broke out that cut off communication and imports, and prices rose greatly, such that carrying out the agreement becomes extremely burdensome for the contractor and he incurs crushing losses in doing so, then the matter is referred to the judiciary so that it may achieve fairness between the two parties as far as possible. This is the view of the Islamic Fiqh Academy of the Muslim World League in its fifth session, which stated in its resolution:
1- In contracts with deferred performance, such as supply contracts, undertakings and contracting works, if the circumstances in which the contract was concluded change, altering conditions, costs and prices significantly, due to emergent general causes not foreseen at the time of contracting, such that performing the contractual obligation inflicts on the obligor grave and unusual losses arising from price fluctuations in trade, and this was not the result of the obligor's negligence or carelessness in performing his obligations, then in such a case the judge may, upon dispute and at the request of a party, modify the rights and obligations in a manner that distributes the excess loss borne by the contracting party between the two contracting parties.
The judge may also cancel the contract as to the part not yet performed, if he sees that cancelling it is better and easier in the case presented to him, provided that fair compensation is given to the obligee who has the right to performance, covering a reasonable portion of the loss that affects him from the contract, so that this is achieved between them without burdening the obligor. In all these considerations, the judge relies on the opinion of trustworthy experts.
2- The judge may also grant the obligor a respite if he finds that the unforeseen circumstance is likely to pass in a short time, and the obligee is not significantly harmed by this respite.
And Allah knows best.
الحمد لله، والصلاة والسلام على رسول الله، وعلى آله وصحبه، أما بعد:
فليس له الرجوع في هذا الاتفاق وعليه أن يقوم بتنفيذه، وليس له المطالبة بمبلغ زائد على مبلغ الاتفاق، ما دام التأخر في البناء كان بسبب منه هو، والأصل في ذلك قوله تعالى: يَا أَيُّهَا الَّذِينَ آمَنُواْ أَوْفُواْ بِالْعُقُودِ {المائدة:1}، لكن لو فرض أن التأخر لم يكن بسبب منه بل بسبب ظروف قاهرة حالت دون البناء، فعلى سبيل المثال: لو أن عقد مقاولة لإنشاء بناية كبيرة يحتاج إنشاؤها مدة طويلة تم بين طرفين وحدد فيه سعر المتر المكعب من البناء بمائة ريال، وكانت كلفة المتر الواحد من الحديد والإسمنت والأخشاب ونحوها ثمانين ريالاً، فوقعت حرب غير متوقعة قطعت الاتصال والاستيراد، وارتفعت بها الأسعار ارتفاعاً كبيراً بحيث يصبح تنفيذ الاتفاق مرهقاً جداً للمقاول، ويتكبد في سبيله خسائر ماحقة، فهنا يرفع الأمر للقضاء لكي يحقق الإنصاف بقدر الإمكان بين الطرفين، وإلى هذا ذهب مجمع الفقه الإسلامي برابطة العالم الإسلامي في دورته الخامسة، فجاء في قراره:
1- في العقود متراخية التنفيذ كعقود التوريد والتعهدات والمقاولات، إذا تبدلت الظروف التي تم فيها التعاقد تبدلاً غَيّر الأوضاع والتكاليف والأسعار تغيراً كبيراً -بأسباب طارئة عامة- لم تكن متوقعة حين التعاقد، فأصبح بها تنفيذ الالتزام العقدي يُلحق بالملتزم خسائر جسيمة غير معتادة من تقلبات الأسعار في طرق التجارة، ولم يكن ذلك نتيجة تقصير أو إهمال من الملتزم في تنفيذ إلتزاماته، فإنه يحق للقاضي في هذه الحال عند التنازع -وبناء على الطلب- تعديل الحقوق والالتزامات بصورة توزع القدر المتجاوز للمتعاقد من الخسارة على الطرفين المتعاقدين.
كما يجوز له فسخ العقد فيما لم يتم تنفيذه منه، إذا رأى أن فسخه أصلح وأسهل في القضية المعروضة عليه، وذلك مع تعويض عادل للملتزم له صاحب الحق في التنفيذ يجبر له جانباً معقولاً من الخسارة التي تلحقه من العقد، بحيث يتحقق ذلك بينهما دون إرهاق الملتزم، ويعتمد القاضي في هذه الموازنات جميعاً رأي أهل الخبرة الثقات.
2- ويحق للقاضي أيضاً أن يمهل الملتزم إذا وجد أن السبب الطارئ قابل للزوال في وقت قصير، ولا يتضرر الملتزم له كثيراً بهذا الإمهال.
والله أعلم.