Question
I work in the contracting field, where projects are executed under contracts denominated in the local currency, binding. The execution period lasts up to one year, or less, or more, and payment is made according to completion. The problem is the continuous deterioration of the value of the local currency during the execution period, to the extent that it loses more than half of its purchasing power compared with currencies of stable value, and this leads to losses in profits, and the losses may reach the capital. Therefore, some of the entities contracted with have allowed the submission of a claim letter called: compensation for making good the damage, in which the contractor explains the reasons for requesting compensation, namely the deterioration of the currency and its effect on the value of purchasing materials and project costs, and specifies the extent of the financial damage. In light of it, the contracting entity evaluates the claim and provides appropriate compensation to the contractor, by mutual agreement between the two parties. My question concerns the legitimacy of this procedure or the compensation, and whether it could fall under the prohibition of riba, because it is an increase over the contract amount? May Allah reward you with good.
Answer
All praise is due to Allah, and may peace and blessings be upon the Messenger of Allah, and upon his family and companions. To proceed:
Since the contracting entities are the ones who allow the submission of this letter, we do not see any blame upon you in accepting the compensation they decide upon. Likewise, there is no blame upon the contractor, if unusual losses occur due to causes beyond his control, and not as a result of his negligence or carelessness, in raising his matter to the judge and demanding a fair settlement of the rights and obligations of a contract of contracting that extends over time.
The resolution of the Islamic Fiqh Academy concerning emergency circumstances and their effect on rights and contractual obligations states the following: First: In contracts whose performance is deferred, such as supply contracts, undertakings, and construction contracts, if the circumstances in which the contract was concluded change in a way that significantly alters conditions, costs, and prices, due to general emergency causes that were not foreseeable at the time of contracting, so that performing the contractual obligation would inflict on the obligor grave losses that are not usual from fluctuations of prices in trade, and this was not the result of the obligor's negligence or neglect in performing his obligations, then the judge, in this case, upon dispute and upon request, may adjust the contractual rights and obligations in a manner that distributes the excess loss borne by one contracting party between both contracting parties. He may also terminate the contract with respect to what has not been performed, if he sees that termination is more appropriate and easier for the case before him, and this is with fair compensation to the obligee who holds the right of performance, which compensates him for a reasonable part of the loss that affects him from the termination of the contract, so that justice is achieved between them without burdening the obligor. The judge relies in all these balancings on the opinion of trustworthy experts.
Second: The judge may also grant the obligor a respite if he finds that the emergency cause is likely to disappear within a short time and the obligee is not greatly harmed by this respite.
This said, the Council of the Academy holds that this solution, derived from the principles of Sharia, achieves the justice required between the two parties to the contract, and prevents harm that burdens one of the contracting parties for a cause in which he has no part, and that this position is more akin to wise Islamic jurisprudence, and closer to the rules of Sharia, its general objectives, and its justice. End quote.
For further benefit, refer to the two fatwas: 9215، 73493.
And Allah knows best.
الحمد لله، والصلاة والسلام على رسول الله، وعلى آله وصحبه، أما بعد:
فما دامت الجهات المتعاقد معها هي التي تتيح تقديم هذا الخطاب، فلا نرى عليك حرجًا في قبول التعويض الذي تحكم به، وكذلك لا حرج على المقاول في حال حصول خسائر غير معتادة بأسباب خارجة عن قدرته، وليس نتيجة تقصير، أو إهمال منه، أن يرفع أمره للقاضي، والمطالبة بتسوية عادلة لحقوق، والتزامات عقد المقاولة المتراخي الزمن.
فقد جاء في قرار مجمع الفقه الإسلامي المتعلق بشأن الظروف الطارئة، وتأثيرها في الحقوق، والالتزامات العقدية، ما يلي: أولا: في العقود المتراخية التنفيذ -كعقود التوريد، والتعهدات، والمقاولات- إذا تبدلت الظروف التي تم فيها التعاقد تبدلا غيّر الأوضاع، والتكاليف، والأسعار تغييرا كبيرا، بأسباب طارئة عامة لم تكن متوقعة حين التعاقد، فأصبح بها تنفيذ الالتزام العقدي يلحق بالملتزم خسائر جسيمة غير معتادة من تقلبات الأسعار في طرق التجارة، ولم يكن ذلك نتيجة تقصير، أو إهمال من الملتزم في تنفيذ التزاماته، فإنه يحق للقاضي في هذه الحال عند التنازع، وبناء على الطلب تعديل الحقوق، والالتزامات العقدية بصورة توزع القدر المتجاوز للمتعاقد من الخسارة على الطرفين المتعاقدين، كما يجوز له أن يفسخ العقد فيما لم يتم تنفيذه منه إذا رأى أن فسخه أصلح، وأسهل في القضية المعروضة عليه، وذلك مع تعويض عادل للملتزم له صاحب الحق في التنفيذ يجبر له جانبا معقولا من الخسارة التي تلحقه من فسخ العقد، بحيث يتحقق عدل بينهما دون إرهاق للملتزم، ويعتمد القاضي في هذه الموازنات جميعا رأي أهل الخبرة الثقات.
ثانيا: ويحق للقاضي أيضا أن يمهل الملتزم إذا وجد أن السبب الطارئ قابل للزوال في وقت قصير، ولا يتضرر الملتزم له كثيرا بهذا الإمهال.
هذا، وإن مجلس المجمع الفقهي يرى في هذا الحل المستمد من أصول الشريعة تحقيقا للعدل الواجب بين طرفي العقد، ومنعا للضرر المرهق لأحد العاقدين بسبب لا يد له فيه، وأن هذا الحال أشبه بالفقه الشرعي الحكيم، وأقرب إلى قواعد الشريعة ومقاصدها العامة وعدلها. اهـ.
وراجع للفائدة الفتويين: 9215، 73493.
والله أعلم.